Student Programs
Pub Renovation
Pagoda
Union Building (PUB) Renovation Background Information
In
May of 2006 the Pagoda Union Building (PUB) will be torn down to
the existing foundation, and construction will begin on a new
student union building. The remodeled PUB will be built on the
existing footprint of the current building’s foundation, and will
add a third floor to the current two-floor design.
The new PUB will include the Bookstore, moved from its current
location in the basement of the FOSS building, offices for the
Ebbtide (student newspaper--moved from the 1500 building). A new
kitchen and food service area and two new dining rooms will be
included in the new PUB. A study lounge, numerous meeting rooms, a
game room, and a quiet lounge will also be added to the new
building.
Several offices currently housed in the PUB will also be located in
the new building, including Diversity and Student Success (the
Multicultural Center and Women’s Center), Safety and Security,
Student Government, Student Programs (Arts and Entertainment Board,
Campus Ambassadors, support services for clubs and organizations,
and Transfer Student Tutoring).
The campus Plant
Operations offices, including maintenance and custodial services,
will be moved from the basement of the current PUB to a new facility
in order to accommodate the move of the Bookstore into the bottom
floor of the new building.
Construction on the
new PUB is scheduled for completion by September of 2007. The
project is projected to cost $17.5 million. A certificate of
participation (COP) was granted by the state in 2005 as a low
interest loan to finance the construction project. The loan will be
repaid largely through a student building fee that was enacted by a
vote of the students in December of 1999. Funds from the College
Bookstore, the Food Service, Whidbey Coffee, and International
Student enrollment are also being used to pay off the COP.
The design for the
new PUB was created by Opsis Architects of Portland, Oregon. Opsis
specializes in student union buildings for college and university
campuses, and has designed many of these facilities in the state of
Washington, most recently the student union building at Highline
Community College that opened in the spring of 2005.
Student Fee Funding Sources:
a. PUB
Renovation Fee: On December 7 and 8,
1999, Shoreline Community College students voted to approve a ballot
measure to establish a new PUB Renovation Fee for remodeling the
PUB. The text of the ballot issue approved by students in the
election reads:
“For the purpose of
remodeling the Student Center (PUB), shall the Associated Students
of Shoreline Community College assess themselves a $3.00 per credit
fee (maximum 10 credits) to begin fall of 2000 and continue until
Student Center obligations are complete?”
b.
Student Services and Activities Fees:
Since 1987, students have set aside a portion of the Student
Services and Activities Fee Budget for a PUB Reserve Fund to remodel
the building. There have been two elections held where students
voted to set aside a portion of the SS&A Fee Budget for remodeling
the PUB (1987 and 1991). Additionally, in spring of 1999 the
College Board of Trustees approved a request by Student Government
to set aside an additional 4.6 percent of the SS&A Fee Budget for
remodeling the PUB. All of these actions combined amount to
approximately 7.6% of the SS&A Fee Budget. The PUB Reserve was
budgeted at 7.6% for 2004-05, producing an estimated $69,700 in
revenue. These funds are transferred to the PUB Renovation Fee
Budget at the end of each fiscal year.
The PUB Reserve
Fund was used three times in the past: to match a state of
Washington Americans With Disabilities Act (ADA) grant to build a
disabled elevator for the FOSS Building and PUB; to build the
Multicultural/Diversity Education Center in 1997-98; and to improve
lighting and restrooms in the PUB in 1994.
The December 1999
election was held to establish a separate fee in addition to funds
dedicated to remodeling the PUB through the SS&A Fee Budget. At
current enrollment levels, these two sources of revenue will produce
approximately $500,000-$550,000 per year dedicated to remodeling the
PUB.
Building
Plans: A needs assessment conducted by
Student Government in 1989 identified the following improvements as
priorities:
1.
Quiet, private dining
areas to eat, talk and study
2.
Lounge space for students
to study, meet informally, sleep and listen to music
3.
More meeting rooms for
clubs and organization
4.
Office space for student
clubs and organizations
5.
A game room for
interactive games like ping pong and pool
6.
Covered access and
improved disabled access to the FOSS Building from the PUB
7.
A separate area for
entertainment, apart from dining areas
8.
Increased restrooms,
especially women’s
9.
Improved lighting
throughout the building
10.
An area for designing
posters for events
11.
Redesign the food service
area, including a mini kitchenette for conferences & rentals.
The 1999 election
that created the PUB Renovation fee included the following proposals
for remodeling the building in the promotional materials, drawn
largely from the 1989 needs assessment.
* create quiet, private
dining areas to eat, talk and study
· create
lounge space for students to study, meet informally, sleep,
listen to music or watch TV
* increase meeting rooms
for clubs and organizations
* increase office space
for student clubs and organizations
* build a game room for interactive games like pool,
ping pong, foosball
* create sufficient bathroom space, especially
women’s
* build covered access to the FOSS building from the
PUB
· create
separate entertainment areas in the building for concerts,
lectures and events.
* build an office in the PUB for the Ebbtide
(student newspaper).
· create
an outdoor plaza between the PUB and the FOSS Building for
concerts and other events. |